Nondestructive Investigation to Determine Length of a Number of Concrete Piles, SA (Q1 2015).

  • Pile One.
  • Pile Two.
  • Pile Three.
  • Site View.

GBG Australia undertook a nondestructive investigation to determine the length of a number of piles on a communication tower, South Australia. The investigation was undertaken using Impulse Response.

Figure 1: Pile One.

Figure 2: Pile Two.

Figure 3: Pile Three.

Figure 4: Site View.